THE PARKLINE
  • Home
  • Building Specs
  • Building Amenities
  • Floorplans
  • Location
  • Photos
  • Videos
  • Contact

BUILDING SPECS

Available RSF
​+/-130,500 RSF across 3 floors
Level 2 Virtual Tour
​Developers + Floor plates
Owner:
State Employees’ Credit Union
​
Design Team:
Little Diversified Architectural Consulting

​
General Contractor:
Barnhill Contracting
​

Floor Plates:
Floors 2-4: 43,500 RSF
​
​Structure + Access
Ceiling Height:
Floors 2-4: 15’ slab to slab
Lower Level: Varies


​Structure:
Structural steel frame with cantilevered concrete floors
​
Parking Ratio:
5.0/1,000 RSF

​
Access:
Direct access via US-15/501 and Old Durham Road
​

Security:
24 hour card access
​
​Safety, HVAc, + Electrical
Safety:
​NFPA Fire Alarms and full sprinkler system
​
​
​HVAC:
Entirely new high-efficiency air-cooled chillers on grade and condensing boilers in boiler room

Tenant Electrical Load Capacity:
Floors 2-4:

2 electrical closets which
each include:
  (1) 112.5 KVA Transformer
  (2) 120/208v Panels
  (1) 480/277 Panel
210 circuits per closet

​​
Lower Level:
2 electrical closets which
each include:
  (2) 112.5 KVA Transformer
  (4) 120/208v Panels
  (1) 480/277 Panel
378 circuits per closet


*Each electrical closet is on generator standby power
Picture
Picture
Picture
Picture
  • Home
  • Building Specs
  • Building Amenities
  • Floorplans
  • Location
  • Photos
  • Videos
  • Contact